//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/default.inc.php on line 265
9 1 10 USULAN PENINGKATAN KUALITAS PRODUKSI COIL TRANSFORMATOR DI PT NIKKATSU ELECTRIC WORKS MENGGUNAKAN LEAN SIX SIGMA 119940906 - Yuniar, S.T., M.T. Dosen Pembimbing 1 ANJAS ADIANSYAH / 132021100 Penulis mixed material Teknik Industri FTI 2025 USULAN TATA LETAK PENYIMPANAN PRODUK ROTI PADA WAREHOUSE DI PD SRI REJEKI MENGGUNAKAN METODE DEDICATED STORAGE 119940906 - Yuniar, S.T., M.T. Dosen Pembimbing 1 EBAAD ELRAHMAN KHAIRUL ALAM / 132021080 Penulis mixed material Teknik Industri FTI 2025 USULAN PERBAIKAN KUALITAS PROSES PRODUKSI PAKAIAN ATAS MUSLIM WANITA DI PT BESOK ADA HASIL DENGAN MENGGUNAKAN METODE LEAN SIX SIGMA 119940906 - Yuniar, S.T., M.T. Dosen Pembimbing 1 PASYA ALIFIANKA SUBAGJA /132021061 Penulis mixed material Teknik Industri FTI 2025 STRATEGI PENINGKATAN KUALITAS PRODUK MATTRESS MENGGUNAKAN METODE LEAN SIX SIGMA DI PT. ROYAL ABADI SEJAHTERA 119940906 - Yuniar, S.T., M.T. Dosen Pembimbing 1 KURNIA ADRILIA PUTRI / 132021059 Penulis mixed material 20250221 Teknik Industri FTI 2025 EVALUASI PENJADWALAN PROYEK RENOVASI KANTOR PENGURUS KKB BNI FALATEHAN JAKARTA MENGGUNAKAN METODE CPM-PERT 119940906 - Yuniar, S.T., M.T. Dosen Pembimbing 1 SELIA FARAH DEVINA / 132021003 Penulis mixed material 20250211 Teknik Industri FTI 2025 STRATEGI PERBAIKAN KUALITAS PRODUK PIPA BAJA PT KUNANGO JANTAN KOTA PADANG MENGGUNAKAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) DAN FAULT TREE ANALYSIS (FTA) 119940906 - Yuniar, S.T., M.T. Dosen Pembimbing 1 ANGGY SEPTIANI RISKY / 132020147 Penulis mixed material 20250226 Teknik Industri FTI 2025 ANALISIS KELAYAKAN BISNIS PENDIRIAN CABANG BARU KEDAI KOPI DISKUSI DI TAMBUN UTARA BEKASI 119940906 - Yuniar, S.T., M.T. Dosen Pembimbing 1 APRI ARYANTO TATENGKENG / 132020127 Penulis mixed material 20250224 Teknik Industri FTI 2025 USULAN PENINGKATAN KUALITAS PRODUKSI MENGGUNAKAN LEAN SIX SIGMA PADA CV MAJU JAYA RUBBER 119940906 - Yuniar, S.T., M.T. Dosen Pembimbing 1 DAFFA AMMAR TSAQIB / 132020170 Penulis mixed material Teknik Industri FTI 2024 PENJADWALAN PROYEK SHUTDOWN PADA PLANT WET SULFURIC ACID 2 (WSA 2) PT SOUTH PACIFIC VISCOSE DENGAN MENGGUNAKAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) Yuniar, S.T., M.T. Dosen Pembimbing 1 DAVA GAZBIYYA SYAFEI / 132020175 Penulis 119940906 - Yuniar, S.T., M.T. Penulis mixed material Teknik Industri FTI 2024