//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/default.inc.php on line 265
6 1 10 ANALISIS RELIABILITY DAN INTEGRITY PIPELINE TRANSMISI GAS JALUR JAWA BARAT OD 24 INCH DENGAN METODA FOSM DAN DETERMINISTIK ASME B31G SUTOMO ROCHMANDA / 12.2005.078 Dosen Pembimbing 1 Tri Sigit Purwanto, ST., MT Dosen Pembimbing 2 Ahmad Taufik, Ph.D Dosen Pembimbing 1 mixed material Teknik Mesin FTI 2010 DESAIN DAN ANALISIS INSTALASI PIPA BAWAH LAUT DENGAN METODE S-LAY Hadi Muhammad Fahmi / 122009077 Dosen Pembimbing 1 Ahmad Taufik, Ph.D. Dani Rusirawan, Ph.D. mixed material Teknik Mesin FTI 2015 ANALISIS EKSPANSI TERMAL PADA PIPA GAS BAWAH LAUT Dani Rusirawan, Ph.D. Dosen Pembimbing 1 Ahmad Taufik, Ph.D Dosen Pembimbing 2 Prima Megantara / 12-2009-040 Penulis mixed material Teknik Mesin FTI 2015 ANALISIS RISK BASED INSPECTION (RBI) STORAGE TANK BERDASARKAN STANDAR API 581 0405056902 - Dani Rusirawan, ST., MT., Ph.D. Dosen Pembimbing 2 Ahmad Taufik, Ph.D Dosen Pembimbing 1 DERIS ABDUL QUDUS / 122015057 Penulis mixed material 20200124 Teknik Mesin FTI 2020 ANALISIS SISTEM PRODUCTION SEPARATOR DENGAN METODA RAM (RELIABILITY, AVAILABILITY AND MAINTAINABILITY) Rifki Ardian Firdaus /12-2011-144 Penulis Ahmad Taufik, Ph.D Dani Rusirawan, Ph. mixed material Teknik Mesin FTI 2016 ANALISIS RBI PADA GAS SEPARATOR OFFSHORE PROCESSING PLANT BERDASARKAN API 581 HARY BANGUN SUMANTRI / 12.2005.091 Dosen Pembimbing 1 Ahmad Taufik, Ph.D. Tri Sigit P., MT. mixed material Teknik Mesin FTI 2010