//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/default.inc.php on line 265
4
1
10
ANALISIS KEBUTUHAN MODAL KERJA MINIMUM KONTRAKTOR PADA PROYEK REVITALISASI SARANA OLAHRAGA LAPANGAN HOKI KOTA BANDUNG
KATARINA RINI RATNAYANTI, MT.
Asep Gunawan Tirtoutomo / 222007 077
Dosen Pembimbing 1
mixed material
2012
STUDI BIAYA MINIMUM KONTRAKTOR PADA PELAKSANAAN PROYEK KONTRUKSI
KATARINA RINI RATNAYANTI, MT.
Teddy Suryandi / 222007075
Dosen Pembimbing 1
mixed material
Teknik Sipil
FTSP
2012
EVALUASI KELAYAKAN INVESTASI PENGELOLAAN GEDUNG PARKIR MIKO MALL
DONNY ARDIANSYAH / 22 2000 205
Dosen Pembimbing 1
KATARINA RINI RATNAYANTI, MT.
mixed material
Teknik Sipil
FTSP
2011
KAJIAN INVESTASI GEDUNG PARKIR STUDI KASUS GEDUNG PARKIR METRO INDAH MALL BANDUNG.
CHANDRA NITI KUSUMAH / 22.2001.009 / SI
Dosen Pembimbing 1
0413096501 - Dr. Herman, Ir., M.T.
KATARINA RINI RATNAYANTI, MT.
mixed material
Teknik Sipil
FTSP
2009