//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/default.inc.php on line 265
13 1 10 MODIFIKASI ULIR PENEKAN DAN PENGARUH PENAMRAHAN SISTEM PEMANAS PADA PROTOTYPE MESIN PEMERAH BIJI JARAK PAGAR DENGAN METODE POROS PENEKAN BERULIR Tri Sigit Purwanto, ST.,MT. Dosen Pembimbing 2 Marsono, S.T., M.T. Dosen Pembimbing 1 MlJIIAMMAD HARIRIIIIDAYAT /12- 1999- 008 Penulis mixed material Teknik Mesin FTI 2006 PENGEMBANGAN DESAIN ALAT EKSTRAKSI JAHE KAPASITAS 2 KG Tri Sigit Purwanto, ST.,MT. Dosen Pembimbing 2 Dr. Dani Rusirawan, M.T. Dosen Pembimbing 1 Muslihan / 12-2001-193 Penulis mixed material Teknik Mesin FTI 2007 ANALISA KERUSAKAN CREEP PADA PIPA PRIMARY SUPERHEATER BERDASARKAN ANALISA STRUKTUR MIKRO MOCHAMAD FAIZAL BACHRI / 122011093 Dosen Pembimbing 1 Tri Sigit Purwanto, ST.,MT. Meilinda Nurbanasari, ST.,MT.,Ph.D. mixed material Teknik Mesin FTI 2015 ROOT CAUSE ANALYSIS PADA KEGAGALAN BLADE TURBIN UAP PEMBANGKIT LISTRIK TENAGA PANAS BUMI KAPASITAS 55 MW ADIES TRI WIBOWO / 122010034 Dosen Pembimbing 1 Tri Sigit Purwanto, ST.,MT. Meilinda Nurbanasari, Ir.,MT.,Ph.D. mixed material Teknik Mesin FTI 2015 PENGEMBANGAN PERANGKAT LUNAK UNTUK ANALISIS FMECA PADA TURBIN PROPELLER MIKROHIDRO ALFAN EKAJATI LATIEF / 12.2006.068 Dosen Pembimbing 1 Tri Sigit Purwanto, ST.,MT. Tito Shantika, M.ENG mixed material Teknik Mesin FTI 2010 PERANCANGAN DAN SIMULASI TURBIN KAPLAN UNTUK VERY LOW HEAD Tri Sigit Purwanto, ST.,MT. Dosen Pembimbing 1 MUHAMMAD RIZKI AL FATIH / 12 2013 092 Penulis 0405129102 - Mohammad Azis Mahardika., S.T., M.T Dosen Pembimbing 2 mixed material Teknik Mesin FTI 2018 PENGUJIAN SISTEM KONTROL GOVERNOR ELEKTRIK UNTUK TURBIN KAPLAN POROS HORIZONTAL Tri Sigit Purwanto, ST.,MT. Dosen Pembimbing 1 EDI MULYANTO /12-2013-053 Penulis M. Pramuda Sirodz, M.T. Dosen Pembimbing 2 mixed material Teknik Mesin FTI 2018 PEMBUATAN DAN PENGUJIAN BILAH TAPERLESS TURBIN ANGIN SUMBU HORISONTAL MUHAMMAD HABIBI/ 12-2012-188 Penulis Dani Rusirawan, ST., MT., Ph.D Tri Sigit Purwanto, ST.,MT. mixed material Teknik Mesin FTI 2016 ANALISA RUBBING PADA PERMUKAAN PATAHAN TENONHEAD SUDU TURBIN UAP KAPASITAS 55 MW Tri Sigit Purwanto, ST.,MT Dosen Pembimbing 1 ABDUL ROPIK / 12-2010-057 Penulis Meilinda Nurbanasari, Ir.,MT.,Ph.D Dosen Pembimbing 2 mixed material Teknik Mesin FTI 2014 PEMBUATAN INSTALASI SISTEM GASIFIKASI SEKAM KONTINU UNTUK KAPASITAS REAKTOR 7 KG SAHIDRUS / 12.2002.122 Dosen Pembimbing 1 Tri Sigit Purwanto, ST.,MT. MARSONO ST., MT. mixed material Teknik Mesin FTI 2011