//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/sysconfig.inc.php on line 185
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; StringReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 48
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; FileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 84
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; CachedFileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 145
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; gettext_reader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/gettext.php on line 36
Warning: session_start(): Cannot start session when headers already sent in /home/etdlibitenasac/public_html/index.php on line 38
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/show_detail.inc.php on line 42
0429096502 - Hazairin, Ir., M.T.
Dosen Pembimbing 1
0418109104 - Badriana Nuranita, S.T., M.T
Dosen Pembimbing 2
Zaki Abdillah/222015065
Penulis
Pada Umumnya pembangunan gedung di Indonesia masih menjadikan beton konvensional menjadi pilihan yang lebih banyak digunakan dibanding dengan beton pracetak. Dimana beton konvensional seluruh elemen pada konstruksi bangunan dilakukan dilokasi proyek. Berbeda dengan metode konvensional metode pracetak seluruh elemen seperti kolom, balok, dan pelat dibuat terlebih dahulu dipabrik atau hasil pabrikasi lalu dibawa ke lokasi proyek untuk dipasangkan. Studi ini, penulis menggunakan data dari proyek pembangunan Gedung Kuliah Bersama Kampus II UIN Sunan Gunung Djati Bandung untuk bangunan konvensional dan mendesain kembali untuk bangunan pracetak dengan mutu yang sama. Maka didapatkan keandalan struktur dan waktu pelaksanaan pada setiap metode pelaksanaan bangunan tersebut.