//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/sysconfig.inc.php on line 185

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; StringReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 48

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; FileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 84

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; CachedFileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 145

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; gettext_reader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/gettext.php on line 36

Warning: session_start(): Cannot start session when headers already sent in /home/etdlibitenasac/public_html/index.php on line 38
ANALISIS PENURUNAN TANAH LUNAK DI AREA PEMBANGUNAN JALAN CBD TELUK BAYUR KOTA PANGKALPINANG

Detail Cantuman

ANALISIS PENURUNAN TANAH LUNAK DI AREA PEMBANGUNAN JALAN CBD TELUK BAYUR KOTA PANGKALPINANG

ANALISIS PENURUNAN TANAH LUNAK DI AREA PEMBANGUNAN JALAN CBD TELUK BAYUR KOTA PANGKALPINANG


Area kontruksi yang dilakukan pembangunan jalan pada tahun 2019 merupakan area yang memiliki tanah lunak sehingga terjadi penurunan. Setelah dilakukan peneletian kemudian dilakukan perbaikan tanah menggunakan metode Pre Loading tanpa PVD. Analisis penurunan tanah lunak dilakukan menggunakan analisis metode numerik berbasis elemen hingga. Hasil analisis menunjukkan bahwa semakin dalam tanah asli yang dilakukan replacement, maka penurunan konsolidasi yang terjadi akan semakin kecil. Selain itu, perbaikan tanah berupa replacement dapat mereduksi nilai penurunan konsolidasi sebesar 83,75 %. Dapat disimpulkan bahwa dengan adanya timbunan pada perbaikan tanah hasil dari penurunan jauh berbeda sebelum dilakukan perbaikan tanah. Setelah dilakukan perbaikan tanah dilanjutkan dengan perencanaan kontruksi jalan menggunakan perhitungan tebal perkerasan lentur dengan metode AASHTO 1993. Dari hasil perhitungan tebal perkerasan jalan didapatkah hasil dengan tebal perkerasan pondasi bawah sebesar 36 cm, tebal pondasi atas sebesar 15 cm dan tebal perkerasan sebesar 19 cm.


LOADING LIST...

LOADING LIST...

Detail Information

Bagian Informasi
Pengarang Akbar/222016123 - Personal Name
0413096501 - Dr. Herman, Ir., M.T. - Personal Name
0420129302 - Desti Santi Pratiwi S.T., M.T - Personal Name
No. Panggil 2273SI/21
Subyek Perbaikan Tanah, Penurunan Tanah, Analisis Metode
Perencanaan Tebal Perkerasan
Fakultas FTSP
Tahun Terbit 2021
Jurusan Teknik Sipil
Deskripsi Fisik
Info Detil Spesifik


Citation

. (2021).ANALISIS PENURUNAN TANAH LUNAK DI AREA PEMBANGUNAN JALAN CBD TELUK BAYUR KOTA PANGKALPINANG().Teknik Sipil:FTSP

.ANALISIS PENURUNAN TANAH LUNAK DI AREA PEMBANGUNAN JALAN CBD TELUK BAYUR KOTA PANGKALPINANG().Teknik Sipil:FTSP,2021.Text

.ANALISIS PENURUNAN TANAH LUNAK DI AREA PEMBANGUNAN JALAN CBD TELUK BAYUR KOTA PANGKALPINANG().Teknik Sipil:FTSP,2021.Text

.ANALISIS PENURUNAN TANAH LUNAK DI AREA PEMBANGUNAN JALAN CBD TELUK BAYUR KOTA PANGKALPINANG().Teknik Sipil:FTSP,2021.Text

 



Homepage Info

Koleksi  ETD adalah merupakan Tugas Akhir mahasiswa Itenas dalam menempuh program Sarjana/Magister. Seluruh isi dari Tugas Akhir adalah merupakan tanggung jawab penulis sepenuhnya.

Koleksi


Total ETDs : 19475

Total Kunjungan: 25901 dari Maret 2018

Media Sosial / Kanal

Address

UPT Perpustakaan Itenas
Jl. PKH. Mustopha No.23
Bandung 40124, Indonesia
Phone: +62-22-7272215,
email: libary[at]itenas.ac.id

Fatal error: Uncaught Error: Call to undefined function curl_init() in /home/etdlibitenasac/public_html/index.php:112 Stack trace: #0 {main} thrown in /home/etdlibitenasac/public_html/index.php on line 112