//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/sysconfig.inc.php on line 185

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; StringReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 48

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; FileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 84

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; CachedFileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 145

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; gettext_reader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/gettext.php on line 36

Warning: session_start(): Cannot start session when headers already sent in /home/etdlibitenasac/public_html/index.php on line 38

Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/show_detail.inc.php on line 42
<![CDATA[PERBANDINGAN BIAYA DAN WAKTU MOBILE CRANE DENGAN MINI MOVABLE CRANE PADA PEKERJAAN BETON (Studi Kasus:]]> 0429096502 - Hazairin, Ir., M.T. Dosen Pembimbing 1 FAZA RUSYDA ALFAFA / 222016020 Penulis Ratih Dewi Shima, S.T., M.T Dosen Pembimbing 2
Pada Pekerjaan beton diperlukannya manajemen alat berat yang baik agar tercapainya biaya pelaksanaan yang murah dan waktu pe;alsanaan yang cepat serta mutu yang baik sesuai dengan perencanaan. Tujuan dari penelitian ini untuk mengetahui perbandingan biaya dan waktu mobile crane dengan mini movable crane pada pekerjaan beton, metode analisis yang digunakan pad aperhitungan waktu pelaksanaan yaitu berdasarkan produktivitas alat, dan untuk perhitungan biaya berdasarkan biaya operasional alat berat. Dari hasil perhitungan, 1 mobile crane membutuhkan biaya Rp.156.322.249,37 dengan waktu 24 hari, 1 mini movable crane membutuhkan biaya Rp.48.350.267, dengan waktu 16 hari, dan 3 mini movable crane membutuhkan biaya Rp.60.911.429, dengan waktu 10 hari.Sehingga disimpulkan bahwa menggunakan 3 unit mini movable crane lebih unggul dari opsi lainnya, karena memiliki waktu pelaksanaan yang paling cepat dan biaya yang murah.