Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/sysconfig.inc.php on line 185
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; StringReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 48
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; FileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 84
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; CachedFileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 145
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; gettext_reader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/gettext.php on line 36
Warning: session_start(): Cannot start session when headers already sent in /home/etdlibitenasac/public_html/index.php on line 38
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/show_detail.inc.php on line 42
Katarina Rini Ratnayanti, S.T., M.T.
Dosen Pembimbing 1
Aden Firdaus, S.T., M.Sc.
Dosen Pembimbing 2
DICKY SETIAWAN / 222016014
Penulis
Pada pekerjaan perancah diperlukan manajamen perancah yang baik agar tercapainya biaya pelaksanaan yang murah,efisien dan waktu pelaksanaan yang cepat serta mutu yang baik sesuai dengan perencanaan.Tujuan dari penelitian ini untuk mengetahui perbadingan biaya dan waktu antara perancah bambu dan perancah kayu glugu pada pekerjaan gedung rusunawa Rancacili Silinder II Kota Bandung. Dari Hasil perhitungan didapatkan untuk biaya perancah bambu sebesar Rp.1.148.602.734,29 dan untuk biaya perancah kayu glugu Rp. 1.710.499.596,64 dan didapatkan selisih biaya dari perancah bambu dan kayu glugu sebesar Rp.561.887.225,55 Sedangkan dari segi waktu pelaksanaan, total waktu yang diperlukan dalam pemasangan perancah bambu 207 hari, dan perancah kayu glugu 200 hari. Pada pelaksanaan perancah bambu dan kayu glugu lebih murah dan penggunaan perancah kayu glugu lebih cepat 7 hari dibandingkan menggunakan perancah bambu.