//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/sysconfig.inc.php on line 185

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; StringReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 48

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; FileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 84

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; CachedFileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 145

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; gettext_reader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/gettext.php on line 36

Warning: session_start(): Cannot start session when headers already sent in /home/etdlibitenasac/public_html/index.php on line 38
POLA OPERASI KERETA API BANDARA IBU KOTA NEGARA BARU KALIMANTAN TIMUR

POLA OPERASI KERETA API BANDARA IBU KOTA NEGARA BARU KALIMANTAN TIMUR


Pemerintah merencanakan pusat ibu kota negara dan melengkapinya dengan fasilistas prasarana transportasi, salah satunya adalah rencana lintas pelayanan kereta api Sepinggan - Kawasan Inti Pusat Pemerintahan (KIPP). Metode Analisis yang digunakan yaitu MAT (Matriks Asal Tujuan) dengan menghasilkan Grafik Perjalanan Kereta Api (Gapeka). Hasil yang diperoleh dari Analisis ini yaitu pada analisis pola operasi menggunakan metode kapasitas lintas dan waktu tempuh didapatkan Grafik Perjalanan Kereta Api dari tahun 2030 sampai dengan 2045. Pada prasarana dan sarana kereta api Bandara Sultan Aji Muhammad Sulaiman menggunakan jenis E.M.U atau electric multiple unit, dengan jenis kereta KRL I9000 kfW seri EA202 dan KRL Tokyo Metro Seri 7000 dengan kecepatan maksimum 120 km/jam, kapasitas 1.784 orang/rangkaian, daya muat 220 kereta/ penumpang, 1 rangkaian ada 8 kereta dan kapasitas emplasemen menggunakan jalur tunggal. Pola Operasi pada tahun 2030 perlu 6 rangkaian pergerakan dan tahun 2045 perlu 11 rangkaian pergerakan kereta api.


LOADING LIST...

LOADING LIST...

Detail Information

Bagian Informasi
Pengarang Kusumah Ikbal Dachyarna / 222017048 - Personal Name
Dr. Sofyan Triana, S.T., M.T. - Personal Name
No. Panggil 2718SI/24
Subyek Pola Operasi
Gapeka
Kapasitas Lintas
Waktu Tempuh
Fakultas FTSP
Tahun Terbit 2024
Jurusan Teknik Sipil
Deskripsi Fisik
Info Detil Spesifik


Citation

. (2024).POLA OPERASI KERETA API BANDARA IBU KOTA NEGARA BARU KALIMANTAN TIMUR().Teknik Sipil:FTSP

.POLA OPERASI KERETA API BANDARA IBU KOTA NEGARA BARU KALIMANTAN TIMUR().Teknik Sipil:FTSP,2024.Text

.POLA OPERASI KERETA API BANDARA IBU KOTA NEGARA BARU KALIMANTAN TIMUR().Teknik Sipil:FTSP,2024.Text

.POLA OPERASI KERETA API BANDARA IBU KOTA NEGARA BARU KALIMANTAN TIMUR().Teknik Sipil:FTSP,2024.Text

 



Homepage Info

Koleksi  ETD adalah merupakan Tugas Akhir mahasiswa Itenas dalam menempuh program Sarjana/Magister. Seluruh isi dari Tugas Akhir adalah merupakan tanggung jawab penulis sepenuhnya.

Koleksi


Total ETDs : 19475

Total Kunjungan: 18147 dari Maret 2018

Media Sosial / Kanal

Address

UPT Perpustakaan Itenas
Jl. PKH. Mustopha No.23
Bandung 40124, Indonesia
Phone: +62-22-7272215,
email: libary[at]itenas.ac.id

Fatal error: Uncaught Error: Call to undefined function curl_init() in /home/etdlibitenasac/public_html/index.php:112 Stack trace: #0 {main} thrown in /home/etdlibitenasac/public_html/index.php on line 112