//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/sysconfig.inc.php on line 185

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; StringReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 48

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; FileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 84

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; CachedFileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 145

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; gettext_reader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/gettext.php on line 36

Warning: session_start(): Cannot start session when headers already sent in /home/etdlibitenasac/public_html/index.php on line 38

Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/show_detail.inc.php on line 42
<![CDATA[USULAN JADWAL PRODUKSI MENGGUNAKAN METODE CAMPBELL DUDEK SMITH DAN NAWAZ ENSCORE HAM DI EARTHY GENOVA]]> Nabila Belivia Azhar / 132021001 Penulis
Earthy Genova merupakan sebuah brand pakaian berbahan dasar denim. Sistem produksi yang digunakan perusahaan adalah Make To Stock (MTS) dan Make To Order (MTO), aliran produksi flow shop dengan aturan First Come First Served (FCFS). Permasalahan yang terdapat pada perusahaan adalah sering terjadi keterlambatan produksi, sedangkan pada September 2024 terdapat kenaikan jumlah permintaan. Penelitian ini dilakukan untuk menentukan jadwal produksi yang menghasilkan makespan terkecil dengan menggunakan metode Campbell Dudek Smith (CDS) dan Nawaz Enscore Ham (NEH). Metode CDS menghasilkan makespan sebesar 23586,32 menit atau 22 hari, sedangkan Metode NEH menghasilkan makespan sebesar 23520,94 menit atau 22 hari. Berdasarkan ganttchart yang dihasilkan pada penjadwalan terpilih dapat dilakukan overlapping untuk memaksimalkan penggunaan mesin. Hasil nilai makespan yang diperoleh setelah dilakukan overlapping adalah 23435,73 menit atau 22 hari.