//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/sysconfig.inc.php on line 185
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; StringReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 48
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; FileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 84
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; CachedFileReader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/streams.php on line 145
Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; gettext_reader has a deprecated constructor in /home/etdlibitenasac/public_html/lib/lang/php-gettext/gettext.php on line 36
Warning: session_start(): Cannot start session when headers already sent in /home/etdlibitenasac/public_html/index.php on line 38
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/show_detail.inc.php on line 42
Bernardinus Herbudiman, S.T., M.T.
Dr. Tech. Aswandy., Ir., M.T.
Wajihan Gilman Santoso /222006013
Dosen Pembimbing 1
Akhir-akhir ini sedang dikembangkan metode perencanaan seismik struktur dengan konsep berbasis perpindahan. Dengan konsep ini struktur direncanakan berdasarkan target perpindahan yang dikehendaki. Tulisan ini membahas aplikasi konsep berbasis perpindahan pada perencanaan struktur beton bertulang dengan memperbesar dan memperkecil inersia dimensi kolom as built sebesar 10%, 20%, dan 30%. Hasil perencanaan kemudian dianalisis dengan analisis pushover untuk mengetahui kinerja bangunan. Hasil analisis menunjukkan bahwa gaya geser dasar yang diperoleh dari metode direct displacement-based design dengan variasi dimensi kolom -30%, -20%, -10% , 0%, 10%, 20%, 30% dari inersia as built untuk arah X dan Y adalah 65.916 kg, 64.181 kg, 64.572 kg, 64.605 kg, 62.323 kg, 61.725, dan 62.448 kg. Sedangkan dari analisis pushover pada performance point menghasilkan gaya geser dasar dengan variasi dimensi kolom -30%, -20%, -10% , 0%, 10%, 20%, 30% dari inersia as built berturut-turut untuk arah X sebesar 378.219 kg, 386.481 kg, 393.640 kg, 400.791 kg, 407.265 kg, 412.818 kg, dan 418.092 kg. Sedangkan untuk arah Y dengan variasi dimensi kolom -30%, -20%, -10% , 0%, 10%, 20%, 30% dari inersia as built adalah 390.894 kg, 395.337 kg, 399.131 kg, 346.215 kg, 406.228 kg, 409.439 kg, dan 411.782 kg. Waktu getar efektif SDOF hasil dari metode direct displacementbased design dengan variasi dimensi kolom -30%, -20%, -10% , 0%, 10%, 20%, 30% dari inersia as built untuk X dan Y adalah 2,69 detik, 2,75 detik, 2,76 detik, 2,85 detik, 2,88 detik, dan 2,88 detik. Sedangkan dari analisis pushover dengan variasi dimensi kolom -30%, -20%, -10% , 0%, 10%, 20%, 30% dari inersia as built untuk arah X diperoleh 0,564 detik, 0,545 detik, 0,531 detik, 0,518 detik, 0,508 detik, 0,499 detik, dan 0,493 detik. Sedangkan untuk arah Y dengan variasi dimensi kolom -30%, -20%, -10% , 0%, 10%, 20%, 30% dari inersia as built adalah 0,602 detik, 0,600 detik, 0,598 detik, 0,597 detik, 0,597 detik, 0,596 detik, dan 0,597 detik. Kata kunci: konsep berbasis perpindahan, kinerja bangunan, analisis pushover.