//
Warning: Cannot modify header information - headers already sent by (output started at /home/etdlibitenasac/public_html/index.php:1) in /home/etdlibitenasac/public_html/lib/contents/default.inc.php on line 265
4
1
10
PERENCANAAN SISTEM INSTALASI PLAMBING AIR BERSIH, AIR LIMBAH DOMETIK SEWAGE TREATMENT PLANT (STP) DI APARTEMEN MENARA TOWER E MATOA CIBINONG
WAHYUDI/252015015
Penulis
mixed material
Teknik Lingkungan
FTSP
2020
PERENCANAAN SISTEM PLAMBING DAN AIR LIMBAH DI APARTEMEN KAIRAKU RESIDENCE DENGAN KONSEP WATER CONSERVATION (WAC)
0401077404 - Yulianti Pratama , ST MT
Dosen Pembimbing 1
BAGASKARA NUGRAHA PERMANA P / 25-2015-023
Penulis
Anindito Nurprabowo, S.T., M.T
Dosen Pembimbing 2
mixed material
Teknik Sipil
FTSP
2019
PERENCANAAN INSTALASI SISTEM PLAMBING AIR BERSIH, AIR LIMBAH, DAN VEN DI GEDUNG ROYAL PARADISE APARTMENT DENGAN KONSEP KONSERVASI AIR
0421077802 - Kancitra Pharmawati ST, MT.
Dosen Pembimbing 1
VINE VALENIA DAVID / 252015085
Penulis
Ir. Djoni Kusmulyana Usman, M.Eng
Dosen Pembimbing 2
mixed material
Teknik Lingkungan
FTSP
2019
PERENCANAAN SISTEM PLAMBING AIR LIMBAH DENGAN PENERAPAN KONSEP GREEN BUILDING PADA GEDUNG PANGHEGAR RESORT DAGO GOLF-HOTEL&SPA
Delete Dhea Yafina Rinka / 252009009
Penulis
Moch. Rangga Sururi, S.T., M.T
Eka Wardhani, S.T., M.T
mixed material
Teknik Lingkungan
FTSP
2014